首頁(yè) > 標準下載>IEC TS 62257-7-3-2018 農村電氣化可再生能源和混合系統建議--第7-3部分:發(fā)電機組--農村電氣化系統發(fā)電機組的選擇 Recommendations for renewable energy and hybrid systems for rural electrification – Part 7-3: Generator set – Selection of generator sets for rural electrification systems免費下載
IEC TS 62257-7-3-2018 農村電氣化可再生能源和混合系統建議--第7-3部分:發(fā)電機組--農村電氣化系統發(fā)電機組的選擇 Recommendations for renewable energy and hybrid systems for rural electrification – Part 7-3: Generator set – Selection of generator sets for rural electrification systems IEC TS 62257-7-3-2018 農村電氣化可再生能源和混合系統建議--第7-3部分:發(fā)電機組--農村電氣化系統發(fā)電機組的選擇 Recommendations for renewable energy and hybrid systems for rural electrification – Part 7-3: Generator set – Selection of generator sets for rural electrification systems

IEC TS 62257-7-3-2018 農村電氣化可再生能源和混合系統建議--第7-3部分:發(fā)電機組--農村電氣化系統發(fā)電機組的選擇 Recommendations for renewable energy and hybrid systems for rural electrification – Part 7-3: Generator set – Selection of generator sets for rural electrification systems

  • 標準類(lèi)別:
  • 標準大?。?/li>
  • 標準編號:IEC TS 62257-7-3-2018
  • 標準狀態(tài):現行
  • 更新時(shí)間:2023-10-30
  • 下載次數:次
標準簡(jiǎn)介

This part of IEC 62257 specifies the general requirements for the selection, sizing, erection 
and operation of generator sets in decentralized rural electrification systems. 
It applies to all low voltage combustion engine electricity generator sets energized by 
renewable energy such as biomass gasifier or biogas, or fossil fuel such as gasoline or diesel 
fuel, and designed for supplying electrical power to isolated sites used in systems as 
described in IEC TS 62257-2. 
This document is not an exhaustive resource for the design, installation, operation or 
maintenance of generator sets, but is more focused on recommendations to provide strategies 
on selection and criteria which may affect the use of such generation systems in a rural 
electrification project. 
Four cases of micropower plant will be considered as illustrated by Figure 1 to power a 
collective electrification system (microgrid) or an individual electrification system.  
– the micropower plant is composed of one generator set; 
– the micropower plant is composed of multiple generator sets, which may have a single 
energy source or multiple energy sources;  
– the micropower plant which is a hybrid energy system between one generator set and a 
Power Conditioning Sub-system (PCS) which is powered by other energy source including 
renewable energy source or energy storage; 
– the micropower plant which is a hybrid energy system between multiple generator sets and 
multiple Power Conditioning Sub-systems (PCSs) which are powered by other energy 
sources including renewable energy sources or energy storage systems.

標準截圖
下一條:返回列表
版權:如無(wú)特殊注明,文章轉載自網(wǎng)絡(luò ),侵權請聯(lián)系cnmhg168#163.com刪除!文件均為網(wǎng)友上傳,僅供研究和學(xué)習使用,務(wù)必24小時(shí)內刪除。
欧美AAAAAA级午夜福利_国产福利写真片视频在线_91香蕉国产观看免费人人_莉莉精品国产免费手机影院