首頁(yè) > 標準下載>IEC 62264-3-2016 企業(yè)控制系統集成--第3部分:制造過(guò)程管理的活動(dòng)模型 Enterprise-control system integration -- Part 3: Activity models of manufacturing operations management免費下載
IEC 62264-3-2016 企業(yè)控制系統集成--第3部分:制造過(guò)程管理的活動(dòng)模型 Enterprise-control system integration -- Part 3: Activity models of manufacturing operations management IEC 62264-3-2016 企業(yè)控制系統集成--第3部分:制造過(guò)程管理的活動(dòng)模型 Enterprise-control system integration -- Part 3: Activity models of manufacturing operations management

IEC 62264-3-2016 企業(yè)控制系統集成--第3部分:制造過(guò)程管理的活動(dòng)模型 Enterprise-control system integration -- Part 3: Activity models of manufacturing operations management

  • 標準類(lèi)別:
  • 標準大?。?/li>
  • 標準編號:IEC 62264-3-2016
  • 標準狀態(tài):現行
  • 更新時(shí)間:2023-09-27
  • 下載次數:次
標準簡(jiǎn)介

IEC 62264-3:2016 defines activity models of manufacturing operations management that enable enterprise system to control system integration. The activities defined in this document are consistent with the object models definitions given in IEC 62264-1. The modelled activities operate between business planning and logistics functions, defined as the Level 4 functions and the process control functions, defined as the Level 2 functions of IEC 62264-1. IEC 62264-3:2016 defines activity models of manufacturing operations management that enable enterprise system to control system integration. The activities defined in this document are consistent with the object models definitions given in IEC 62264-1. The modelled activities operate between business planning and logistics functions, defined as the Level 4 functions and the process control functions, defined as the Level 2 functions of IEC 62264-1. This second edition cancels and replaces the first edition published in 2007. This edition constitutes a technical revision. This edition includes the following significant technical changes with respect to the previous edition: a) 4.1 Manufacturing Operations Management was moved to Part 1 and therefore was removed from Part 3; b) 4.2 Functional hierarchy was moved to Part 1 and therefore was removed from Part 3; c) 4.4 Criterion for defining activities below Level 4 was moved to Part 1 and therefore was removed from Part 3; d) 4.5 Categories of production information was moved to Part 1 and therefore was removed from Part 3; e) 4.6 Manufacturing operations information was moved to Part 1 and therefore was removed from Part 3; f) 5.3 Expanded equipment hierarchy model was moved to Part 1 and therefore was removed from Part 3; g) 5.4 Expanded decision hierarchy model was removed from Part 3. The corresponding section was removed from Part 1 and replaced with a reference to ISO 15704; h) Annex A (informative) Other enterprise activities affecting manufacturing operations was moved to Part 1 and therefore was removed from Part 3; i) Annex D (informative) Associated standards was moved to Part 1 and therefore was removed from Part 3; j) Annex F (informative) Applying the decision hierarchy model to manufacturing operations management was removed from Part 3. The corresponding section was removed from Part 1 and replaced with a reference to ISO 15704; k) Annex G (informative) Mapping PSLX ontology to manufacturing operations management was removed from Part 3. The committee felt that this section is more appropriate as a PSLX white paper or TR. The names for data were changed to match the Part 4 standard names. These name changes were made in all figures and in the text. dition 2.0 2016-12 INTERNATIONAL STANDARD NORME INTERNATIONALE colour inside Enterprise-control system integration – Part 3: Activity models of manufacturing operations management Intégration des systèmes entreprise-contr?le – Partie 3: Modèles d’activités pour la gestion des opérations de fabrication IEC 62264-3:2016-12(en-fr) THIS PUBLICATION IS COPYRIGHT PROTECTED Copyright ? 2016 IEC, Geneva, Switz

標準截圖
下一條:返回列表
版權:如無(wú)特殊注明,文章轉載自網(wǎng)絡(luò ),侵權請聯(lián)系cnmhg168#163.com刪除!文件均為網(wǎng)友上傳,僅供研究和學(xué)習使用,務(wù)必24小時(shí)內刪除。
欧美AAAAAA级午夜福利_国产福利写真片视频在线_91香蕉国产观看免费人人_莉莉精品国产免费手机影院