IEC 60193-2019 水壓渦輪,存儲渦輪和抽水渦輪--模塊驗收實(shí)驗 Hydraulic turbines, storage pumps and pump-turbines – Model acceptance tests
- 標準類(lèi)別:
- 標準大?。?/li>
- 標準編號:IEC 60193-2019
- 標準狀態(tài):現行
- 更新時(shí)間:2023-09-11
- 下載次數:次
This document applies to laboratory models of any type of impulse or reaction hydraulic turbine,
storage pump or pump-turbine.
This document applies to models of prototype machines either with unit power greater than
5 MW or with reference diameter greater than 3 m. Full application of the procedures herein
prescribed is not generally justified for machines with smaller power and size. Nevertheless,
this document may be used for such machines by agreement between the purchaser and the
supplier.
In this document, the term "turbine" includes a pump-turbine operating as a turbine and the
term "pump" includes a pump-turbine operating as a pump.
This document excludes all matters of purely commercial interest, except those inextricably
bound up with the conduct of the tests.
This document is concerned with neither the structural details of the machines nor the
mechanical properties of their components, so long as these do not affect model performance
or the relationship between model and prototype performances.
This document covers the arrangements for model acceptance tests to be performed on
hydraulic turbines, storage pumps and pump-turbines to determine if the main hydraulic
performance contract guarantees (see 4.2) have been satisfied.
It contains the rules governing test conduct and prescribes measures to be taken if any phase
of the tests is disputed.
The main objectives of this document are:
– to define the terms and quantities used;
– to specify methods of testing and of measuring the quantities involved, in order to ascertain
the hydraulic performance of the model;
– to specify the methods of computation of results and of comparison with guarantees;
– to determine if the contract guarantees that fall within the scope of this document have been
fulfilled;
– to define the extent, content and structure of the final report.
The guarantees can be given in one of the following ways:
– guarantees for prototype hydraulic performance, computed from model test results
considering scale effects;
– guarantees for model hydraulic performance.dition 3.0 2019-04
INTERNATIONAL
STANDARD
NORME
INTERNATIONALE
Hydraulic turbines, storage pumps and pump-turbines –
Model acceptance tests
Turbines hydrauliques, pompes d'accumulation et pompes-turbines –
Essais de réception sur modèle
IEC 60193:2019-04(en-fr)
THIS PUBLICATION IS COPYRIGHT PROTECTED
Copyright ? 2019 IEC, Geneva, Switzerland
All rights reserved. Unless otherwise specified, no p
-
GB/T 1094.1-2013電力變壓器 第1部分:總則 2023-09-11
-
GB/T 706-2016熱軋型鋼 2023-09-11
-
JB/T 10216-2013電控配電用電纜橋架 2023-09-11
-
GB 9706.1-2020醫用電氣設備 第1部分:基本安全和基本性能的通用要求 2023-09-11
-
GB/T 10801.2-2018絕熱用擠塑聚苯乙烯泡沫塑料(XPS) 2023-09-11
-
GB/T 13663.2-2018給水用聚乙烯(PE)管道系統 第2部分:管材 2023-09-11
-
GB 51251-2017建筑防煙排煙系統技術(shù)標準 2023-09-11