Construction Process Control of Large Extra Caissons
- 期刊名字:清華大學(xué)學(xué)報自然科學(xué)版(英文版)
- 文件大?。?15kb
- 論文作者:Hu Shaowei,WANG Hongxia,FAN Ji
- 作者單位:Department of Materials and Structural Engineering,School of Naval Architecture and Ocean Engineering,Department of Civi
- 更新時(shí)間:2020-11-10
- 下載次數:次
TSINGHUA SCIENCE AND TECHNOLOGYISSN 1007-0214 13/21 pp359-363Volume 10, Number 3, June 2005Construction Process Control of Large Extra CaissonsHU Shaowei (胡少偉+)"*, WANG Hongxia (王紅霞), FAN Jiansheng (樊建生)1. Department of Materials and Structural Engineering, Nanjing Hydraulic Research Institute,Nanjing 210024, China;2. Schoo of Naval Architecture and Ocean Engineering, Shanghai Jiao Tong University,Shanghai 200030, China;3. Department of Civi Engineering, Tsinghua University, Bejing 100084, ChinaAbstract: The complexity of geotechnical engineering and varability in construction circumstances of largeextra caissons make the problem of maintaining appropriate sink attitude quite dificult, especially in keepingsink uniformity and achieving the expected final sink depth. A new construction control method is presentedusing H。theory, considering uncertainties in the mechanics model and external noise in the constructionsite parameters. The design method of an H_ controller has consequently been obtained for large extracaissons. Control results using only constructor experiences are compared with simulation results using theH.. contollr ftor a practical engineering sitution, which indicates that the H。contoller is successful inmaintaining sink uniformity, avoiding sink as well as in achieving the expected final sink depth.Key words: large extra caissons; construction process; atitude control; H_ controlwithout sink attitude analysis from the principle of aIntroductionsink mechanics model. Hu and Niel-l did not considerThe extra caisson is a structure with an open top andthat uncertainties might occur in the process of con-bottom, while the lateral surface is a closed-loop. Thisstruction, and consequently one of the extra caissonsstructure is applied to foundation engineering ofdeflected severely. To solve this kind of control prob-bridges, pump stations, underground plants, under-lem involving uncertainty of the model and statisticalground storages, and foundations of buildings. Sincecharacters of parameter noise, a suitable controlextra caissons are often built in complex soil, in ordermethod should be developed to handle all these com-to keep sink uniformity, to prevent sink sharp, and toplications. In this paper, attitude control of a large ex-achieve the expected final sink depth, the constructiontra caisson is studied using H。。 control theory, takingcontrol of an extra caisson is very important. Althoughinto account uncertainties of the mechanics model andmuch experience has been obtained in constructionexternal noise around the construction site.control, there is still a lack of a mature theory and a1 Equation of Sink Statecredible numerical simulation stable for practical application. Abesener' adjusts excavation in terms ofWithe中國煤化工say, when there is no .observed information; this is a rather passive approachexcava caisson is subjectedReceived: 2003-12-24to itsYH. C N M H Grection on the blade.* * To whom correspondence should be addressed.It also suffers a floating force while undrained. TheE-mail: hushaowei@ nhri.cn; Tel: 86 25- 85829601sink equation under these conditions is'1360Tsinghua Science and Technology, June 2005, 10(3): 359 - 363mh=G-(Ufn-2.5U.f)-K.Kmp.considered when examining control methods for Eq.(3), i.e, a suitable controller based on parameter uncer-| cN. +zrbN, |Ub+rN.Ubh |-N =tainties and external noise must be designed for largeextra caissons.-(U,J +KmpyN、Ub)h+G+2.5U.f-2 Design Problem for H_ ControllerK_Kmp[ cN。+;ybN, Ub-N.(|)The most important thing for sink attitude control of anwhere U, is the external perimeter of the extraextra caisson is to let the extra caisson reach the de-caisson; U2 the internal perimeter of the caisson; Usigned elevation in the designated construction periodthe mean perimeter of the extra caisson, U=(U1+U2)/2;, tatis ()="m alanFurthermore, thef the sidefrictionper unitarea:Nq=0(1+ sinp)e*m1-sin psin(2η+φ)N.=(N。-1)cotp; N,= (N-controller must maintain uniform sinkage, i.e, make1) tan1.4p; c cohesion for unit soil; φ the internaly,()=s°t. The control objective is, therefore, to .t,friction angle; γ gravity of the soil; b the thicknessmake output near y,(t) during the construction pe-of the sidewall;G the dead load and additional loadriod, but without using too much control energy.helping sinkage of the extra caisson (kN); N theSuppose the error vector isweight of outlet water from the sidewall (kN);e(t)= y,(t)-y(t)(4)N =0 (when sink drained); m the mass of the extraand the performance index is given bycaisson; K a factor influenced by the cross sectionJm= ['[e" ()Qe()+ u" ()Ru(t)Jdr(5)and blade reaction; K。a factor influencing reactionof the blade considering disturbance of soil;where Q (positive definite) is the weighting matrix ofgravitational acceleration; and h the sink depth ofthe error vector and R > 0 is a weighting factor of thecaisson. .control vector.Equation (1) can be simplified asFor large extra caisson, the state equation ish=ah+az(2)x=Ax+B,u,x(0)=x。(6)K_K1To minimize Eq. (5), and to ensure a closed-loop sys-wherea=-_γN,Ub--Uf,tem that is continuously stable, a state feedback con-nmtroller is designed,2.5K_KmpNa=g+-( cN。+=ybN,Ub--u= Kx(7)The controller which makes Jmine can be obtainedWe introduce a control force u. The equation ofthrough solving the relevant Riccati equations. So farsink state is then given bythe design problem does not consider the influence of[x=Ax+B,u,extermal noise. That is to say, optimality of perform-l y=Cxx(3)ance index can be achieved only when the controlledobject is described accurately by Eq. (6). The optimal-ity cannot be realized due to noise in real systems. Towhere A =la 0_B.=」C2=[1 0],include this effect, we introduce noise w . The con-trolled model is then given byx, x=h+歲, x=j.x=(A+OA)x+ Bw+ B,u(8)a中國煤化工al.Because there are many uncertainties in construction,:MYHC N M H G the singularity valuethe influence of model uncertainties (here indicated asanalysis theorem,parameter uncertainties) and external noise must beMA=E EF(9)HU Shaowei (胡少佛) et al: Construction Process Control of Large Extra Caissons361where E∈∩ is arbitraryunknown matrix,[(,-Cx) Q(y. -C,x)+ Ru"()]d<2={EIE"E≤l}.Considering a state feedback contolled system thate["w()d,Vw∈L2(16)makes the performance given by Eq. (5) a minimum,tenable to all noises w which satisfy Eq. (14), wherewe defined an auxiliary signal,ε>0 is given constant.Q"0Now discuss controller design problems that satisfyZ=[(x+.e"(10)robust stable performance and interference suppressionwhen uncertainties exist in the system.where Q"2 is the square root of the matrix, andWhile M=0,if A+B,K is a stable matrix andQ=Q"Q42.satisfies closed-loop system.Then J in Eq. (5) is given by(C+D2K)(sI-A-B,K)" B| <1. .J= [~"()2()d= 5h" (1)h(t)dt(11)where h(t) is pulse response of closed-loop systemTo solve the state feedback controller satisfying Eq.constituted by Eqs. (7), (8), and (10).(1) and Eq. (2), supposeIn terms of Parseval identityl4, Eq. (1) can be given_[w7z|的=,i=(17)」° [2」byJ=,C "r'(jo)T(jo)do=The augmented contolled plant is then'71,L ur{r(ja)rT (jo)}dw(12)[y_=G(s)的(18)u」where T() is a closed-loop transfer function fromwtoz.A一B、EB2Equation (12) is the definition of the H2 norm ofrational number T(s),G(s)=|[C]「D.2](19)|(])L=ζ+_([r[()*(io)]do} (3)[F」[0C2Therefore, the design mentioned above is able tosolve the feedback controller K so as to make the Controllers that satisfy design indexes (1) and (2) canclosed-loop system stable and | T(s)|,a minimum.be used to obtain K(s) by solving H__ , the standardInterference suppression of the sink system isdesign problem of augmented controlled plant G(s).discussed next. Noise sets of a large extra caisson areThe controller is then givenby u= K(s)x.defined5I as(14)3 Practical Engineering Example4=05 w()u
-
C4烯烴制丙烯催化劑 2020-11-10
-
煤基聚乙醇酸技術(shù)進(jìn)展 2020-11-10
-
生物質(zhì)能的應用工程 2020-11-10
-
我國甲醇工業(yè)現狀 2020-11-10
-
JB/T 11699-2013 高處作業(yè)吊籃安裝、拆卸、使用技術(shù)規程 2020-11-10
-
石油化工設備腐蝕與防護參考書(shū)十本免費下載,絕版珍藏 2020-11-10
-
四噴嘴水煤漿氣化爐工業(yè)應用情況簡(jiǎn)介 2020-11-10
-
Lurgi和ICI低壓甲醇合成工藝比較 2020-11-10
-
甲醇制芳烴研究進(jìn)展 2020-11-10
-
精甲醇及MTO級甲醇精餾工藝技術(shù)進(jìn)展 2020-11-10